| Sign In | Join Free | My futurenowinc.com |
|
Delivery Time : 15-30 working days
Working brake torque (kN·m) : 61
Model Number : disc brake-350
Safety calipers (set) : 1(2)
MOQ : 1 pcs
Working calipers (set) : 2
Brand Name : XI'AN RIG
Place of Origin : China
Payment Terms : L/C, T/T
Safety braking torque (kN·m) : 28/56
Workover rig model : XJ350
Maximum Hook Load (kN) : 900
Certification : API
Core Differences Between Workover Equipment and Drilling Equipment
1. Drilling rigs focus on rock breaking and drilling new wells; workover rigs focus on old-well repair, process modification, and failure treatment.
2. Drilling rigs work at a fixed well location for long periods; workover rigs are truck-mounted and mobile, with rapid relocation and flexible maneuverability.
3. Drilling pumps provide ultra-high flow and ultra-high pressure for rock-breaking circulation; workover pumps are adapted to well flushing, sand washing, well killing, and chemical injection processes.
4. Drilling emphasizes the rotary drilling system; workover emphasizes the downhole tool system of fishing, milling, jarring, packing off, and stuck-pipe release.
5. Workover equipment has higher requirements for wellhead safety, pressurized operations, and well control prevention, and faces more operating conditions involving active oil and gas zones.

| Workover rig model | Working calipers (set) | Safety calipers (set) | Maximum Hook Load (kN) | Working brake torque (kN·m) | Safety braking torque (kN·m) |
|---|---|---|---|---|---|
| XJ250 | 2 | 1 | 675 | 61 | 28 |
| XJ350 | 2 | 1(2) | 900 | 61 | 28/56 |
|
|
High-Quality Workover Rig Components For Efficient Oilfield Operations Images |